IECC CLIMATE ZONE 4C // Mixed · Marine

Climate Zone 4C Insulation R-Values, Window U-Factor & SHGC Requirements

Side-by-side IECC 2021 vs 2024 residential REScheck and commercial COMcheck thermal envelope specifications for Climate Zone 4C (Seattle, WA, Portland, OR, Tacoma, WA, Eugene, OR, Eureka, CA).

IECC 2021 vs 2024 Thermal Envelope Specification Table — Climate Zone 4C
Assembly Component2021 IECC Residential2024 IECC Residential2021 COMcheck (Com)2024 COMcheck (Com)
Fenestration Max U-Factor0.300.290.360.35
Glazing Max SHGCNR (N/A)NR (N/A)0.360.36
Ceiling / Roof R-Value (Max U)R-60 (0.0240)R-60 (0.0230)R-30ci (above deck) (0.0320)R-30ci (above deck) (0.0307)
Exterior Wall R-Value (Max U)R-20+5ci or R-13+10ci (0.0450)R-20+5ci or R-13+10ci (0.0432)R-13 + 7.5ci (steel) (0.0640)R-13 + 7.5ci (steel) (0.0614)
Floor Insulation (Max U)R-30 (0.0470)R-30 (0.0451)U ≤ 0.0520U ≤ 0.0499
Basement Wall R-ValueR-15ci or R-19R-15ci or R-19C402 Below-GradeC402 Below-Grade
Slab Edge R-Value (Max F)R-10ci (4 ft) (F ≤ 0.52)R-10ci (4 ft) (F ≤ 0.52)F ≤ 0.52F ≤ 0.52
Opaque Door Max U-Factor0.300.290.370.35
Zone 4C Solar Heat Gain Coefficient (SHGC) Guidance

Marine heating-dominated: Residential SHGC is NR (N/A); WSEC 2021 tightens window U-Factor to 0.28.

Representative US Cities in Climate Zone 4C
Seattle, WAPortland, ORTacoma, WAEugene, OREureka, CA

US States Containing IECC Climate Zone 4C (3)

Permit & Energy Code FAQ

What are the residential wall and ceiling R-Values for IECC Climate Zone 4C?

Under 2021 IECC in Climate Zone 4C, prescriptive residential ceilings require R-60 (max U 0.0240) and wood-framed exterior walls require R-20+5ci or R-13+10ci (max U 0.0450).

What is the maximum window U-Factor and SHGC in Climate Zone 4C?

For residential construction under 2021 IECC, Zone 4C requires fenestration U-Factor <= 0.30 (tightening to 0.29 under 2024 IECC modeling) with SHGC NR (N/A). Marine heating-dominated: Residential SHGC is NR (N/A); WSEC 2021 tightens window U-Factor to 0.28.

How does commercial COMcheck differ from residential REScheck in Zone 4C?

Commercial buildings in Zone 4C use steel-framed/mass wall and above-deck roof assemblies (window U <= 0.36, SHGC <= 0.36, roof R-30ci (above deck), wall R-13 + 7.5ci (steel)) and cap prescriptive Window-to-Wall Ratio at 30%.

Explore All 15 IECC Climate Zones

Verify Your Climate Zone 4C Blueprints in Minutes

Upload permit PDFs or CSV schedules to calculate net wall areas, check Zone 4C U-Factor & SHGC compliance, and export DOE REScheck (.rck) or PNNL COMcheck payloads.

Open Takeoff Workbench
IECC Climate Zone 4C (Mixed) — 2021 vs 2024 R-Value, U-Factor & SHGC | EnvelopeCheck