IECC CLIMATE ZONE 4B // Mixed · Dry

Climate Zone 4B Insulation R-Values, Window U-Factor & SHGC Requirements

Side-by-side IECC 2021 vs 2024 residential REScheck and commercial COMcheck thermal envelope specifications for Climate Zone 4B (Albuquerque, NM, Amarillo, TX, Prescott, AZ, St. George, UT).

IECC 2021 vs 2024 Thermal Envelope Specification Table — Climate Zone 4B
Assembly Component2021 IECC Residential2024 IECC Residential2021 COMcheck (Com)2024 COMcheck (Com)
Fenestration Max U-Factor0.300.290.360.35
Glazing Max SHGCNR (N/A)NR (N/A)0.360.36
Ceiling / Roof R-Value (Max U)R-60 (0.0240)R-60 (0.0230)R-30ci (above deck) (0.0320)R-30ci (above deck) (0.0307)
Exterior Wall R-Value (Max U)R-20+5ci or R-13+10ci (0.0450)R-20+5ci or R-13+10ci (0.0432)R-13 + 7.5ci (steel) (0.0640)R-13 + 7.5ci (steel) (0.0614)
Floor Insulation (Max U)R-19 (0.0470)R-19 (0.0451)U ≤ 0.0520U ≤ 0.0499
Basement Wall R-ValueR-10ci or R-13R-10ci or R-13C402 Below-GradeC402 Below-Grade
Slab Edge R-Value (Max F)R-10ci (4 ft) (F ≤ 0.52)R-10ci (4 ft) (F ≤ 0.52)F ≤ 0.52F ≤ 0.52
Opaque Door Max U-Factor0.300.290.370.35
Zone 4B Solar Heat Gain Coefficient (SHGC) Guidance

NR in EnvelopeCheck residential UA engine (prescriptive IECC 2021 lists 0.40 for 4B; 0.36 commercial).

Representative US Cities in Climate Zone 4B
Albuquerque, NMAmarillo, TXPrescott, AZSt. George, UT

US States Containing IECC Climate Zone 4B (7)

Permit & Energy Code FAQ

What are the residential wall and ceiling R-Values for IECC Climate Zone 4B?

Under 2021 IECC in Climate Zone 4B, prescriptive residential ceilings require R-60 (max U 0.0240) and wood-framed exterior walls require R-20+5ci or R-13+10ci (max U 0.0450).

What is the maximum window U-Factor and SHGC in Climate Zone 4B?

For residential construction under 2021 IECC, Zone 4B requires fenestration U-Factor <= 0.30 (tightening to 0.29 under 2024 IECC modeling) with SHGC NR (N/A). NR in EnvelopeCheck residential UA engine (prescriptive IECC 2021 lists 0.40 for 4B; 0.36 commercial).

How does commercial COMcheck differ from residential REScheck in Zone 4B?

Commercial buildings in Zone 4B use steel-framed/mass wall and above-deck roof assemblies (window U <= 0.36, SHGC <= 0.36, roof R-30ci (above deck), wall R-13 + 7.5ci (steel)) and cap prescriptive Window-to-Wall Ratio at 30%.

Explore All 15 IECC Climate Zones

Verify Your Climate Zone 4B Blueprints in Minutes

Upload permit PDFs or CSV schedules to calculate net wall areas, check Zone 4B U-Factor & SHGC compliance, and export DOE REScheck (.rck) or PNNL COMcheck payloads.

Open Takeoff Workbench
IECC Climate Zone 4B (Mixed) — 2021 vs 2024 R-Value, U-Factor & SHGC | EnvelopeCheck