UT ENERGY CODE COMPLIANCE // 3B, 4B, 5B, 6B
Utah Energy Code, IECC Climate Zones & REScheck / COMcheck Guide
Prescriptive building envelope R-Values, maximum fenestration U-Factors, SHGC caps, and blueprint takeoff rules for Utah (2021 IECC (Utah State Construction Code Amended) / 2021 IECC / ASHRAE 90.1-2019).
Residential Energy Code
2021 IECC (Utah State Construction Code Amended)
Commercial Energy Code
2021 IECC / ASHRAE 90.1-2019
Representative ZIP
84101 · Climate Zone 5B
DOE REScheck Acceptance
Accepted Statewide (DOE REScheck-Web)
PNNL COMcheck Acceptance
Accepted Statewide (PNNL COMcheck-Web)
Sample Major Cities
Salt Lake City (5B), Provo (5B), St. George (3B), Park City (6B)
Applicable IECC Climate Zones in Utah
U ≤ 0.30 · SHGC: 0.25
R-20+0 or R-13+5ci / R-49
U ≤ 0.30 · SHGC: NR (N/A)
R-20+5ci or R-13+10ci / R-60
U ≤ 0.30 · SHGC: NR (N/A)
R-20+5ci or R-13+10ci / R-60
U ≤ 0.30 · SHGC: NR (N/A)
R-20+5ci or R-13+10ci / R-60
| Envelope Component | Residential Target | Commercial Target |
|---|---|---|
| Fenestration Max U-Factor | 0.30 | 0.36 |
| Glazing Max SHGC | NR (N/A) | 0.38 |
| Ceiling / Roof Insulation & Max U | R-60 (U ≤ 0.0240) | R-30ci (above deck) (U ≤ 0.0320) |
| Above-Grade Wall R-Value & Max U | R-20+5ci or R-13+10ci (U ≤ 0.0450) | R-13 + 10ci (steel) (U ≤ 0.0550) |
| Floor Insulation & Max U | R-30 (U ≤ 0.0330) | U ≤ 0.0520 |
| Basement Wall R-Value | R-15ci or R-19 | ASHRAE 90.1 Table C402 |
| Slab Perimeter R-Value & Max F | R-10ci (4 ft) (F ≤ 0.51) | F ≤ 0.51 |
| Opaque Door Max U-Factor | 0.30 | 0.37 |
Blueprint PDF to REScheck (.rck) & COMcheck Workflow
Upload Architectural Permit PDF or CAD Schedule
Drop elevations and window/door schedules into EnvelopeCheck. Parent-wall gross areas and opening deductions calculate automatically.
Audit Against State Climate Zone & Code Limits
Resolve ZIP-to-climate-zone U-Factor, SHGC, and R-Value limits inline and clear amber missing-parameter diagnostics before city plan check.
Export DOE REScheck (.rck) or PNNL COMcheck Bundle
Download clean .rck XML, formula-audited .xlsx workbooks, or PNNL COMcheck JSON plus 1 free Revision 2 Diff when plans change.
Permit & Energy Code FAQ
What residential and commercial energy codes does Utah enforce?
Utah enforces 2021 IECC (Utah State Construction Code Amended) for residential projects and 2021 IECC / ASHRAE 90.1-2019 for commercial construction. Wasatch Front (Salt Lake, Provo, Ogden) is Zone 5B, St. George is Warm-Dry Zone 3B, and Summit County (Park City) is Cold-Dry Zone 6B.
Which IECC climate zones apply in Utah?
Utah spans IECC Climate Zone(s) 3B, 4B, 5B, 6B, with Zone 5B representing its primary metro baseline (e.g., Salt Lake City (5B), Provo (5B), St. George (3B), Park City (6B)).
Can I submit DOE REScheck or PNNL COMcheck reports for Utah building permits?
Residential status: Accepted Statewide (DOE REScheck-Web). Commercial status: Accepted Statewide (PNNL COMcheck-Web). EnvelopeCheck compiles blueprint PDFs into clean .rck XML and COMcheck JSON payloads to accelerate permit filing.
Automate Your Utah Permit Envelope Takeoff
Stop manually re-keying Utah window and wall schedules. Preview your Climate Zone 5B UA margin and first 5 assemblies free with zero login.